Free Work Breakdown Structure
Break a project into deliverables and smaller work packages in levels.
Enter the main deliverables, then list the tasks beneath each one with a numbered code. The structure shows how the whole project is made up of smaller pieces.
How to use the Work Breakdown Structure
- Enter the project name and add your tasks, owners and dates.
- Check the chart or table in the preview and adjust anything that looks wrong.
- Download the PDF and share it with your team or client.
About the Work Breakdown Structure
Break a project into deliverables and smaller work packages in levels.
Projects go wrong when nobody can see who does what and by when. A clear chart, register or report keeps a team looking at the same picture.
Getting started with the Work Breakdown Structure
Using the work breakdown structure takes a minute or two. Your entries are saved in this browser, so you can come back later and carry on.
Tips for better results
Keep splitting until each package can be estimated and assigned to one person, and make sure the pieces cover all of the scope.
Keep tasks small enough to finish in a week or two.
Update the chart whenever dates change so the team trusts it.
Privacy and where your data goes
Everything you type into the work breakdown structure stays on your own device. Zapxa does not receive your numbers or documents. If you clear your browser data, your saved entries will be removed, so download a PDF of anything you want to keep.
Frequently asked questions
What does the 100% rule mean?
The child items under a deliverable should add up to all of its work, no more and no less.
How deep should the structure go?
Usually three or four levels is enough.
Is the work breakdown structure free?
Yes. It is free to use with no signup, no watermark and no usage limits.
Is my data private?
Yes. Your inputs are processed in your browser and saved only in its local storage. They are not uploaded to our servers.
Does it work on mobile?
Yes. Zapxa works on phones, tablets and desktops. Use the print button or download a PDF to keep a copy.
Related Project Charts tools
- Gantt Chart Maker — Build a Gantt chart from task start dates and durations.
- Simple Gantt Chart — Draw a basic task timeline for a small project in minutes.
- Project Timeline — Lay out project phases and tasks along a timeline with dates and durations.
- Project Schedule — Create a task schedule with owners, dates and durations on a bar chart.
- Construction Schedule — Sequence construction activities by start date and duration in a timeline.
- RACI Matrix — Assign responsible, accountable, consulted and informed roles to tasks.